DWF/Storm Dividing Wall Construction
cs image
OVERVIEW

This project, involved the construction of a robust dividing wall to enhance site functionality. Completed efficiently, the work emphasised structural stability and precision in material handling and installation.

SCOPE OF WORK

Preparation and Material Handling

  • Arranged delivery of all necessary materials and skip to the site, ensuring placement in a safe and accessible location.

 

Wall Construction

  • Drilled 18mm tie-in bars into the top of the existing 250mm wide wall for secure anchoring.
  • Supplied and installed heavy dense hollow blocks to construct the dividing wall, measuring:
    Height: 1500mm
    Length: 5070mm
  • Applied mortar between blocks and inserted drilled rods into the recesses for additional stability.

 

Concrete Reinforcement

  • Upon achieving the required wall height, hand-mixed C30 concrete on-site.
  • Filled the recesses of the blocks with concrete to ensure enhanced strength and structural integrity.

 

Site Cleanup and Handover

  • Cleared all waste generated during the project.
  • Provided completion photographs to the client, showcasing the finished wall.
OUTCOME

The dividing wall was successfully constructed with attention to detail and quality, delivering:

  • A durable and stable structure reinforced with tie-in bars and concrete filling.
  • Clean and professional execution, leaving the site in optimal condition.

 

This project demonstrates our capability to handle precision construction tasks while maintaining excellent communication and satisfaction with the client.Bottom of Form