Wet Well Entry System
cs image
OVERVIEW

This project involved the design and construction of a safe and efficient entry system for a wet well, enabling maintenance, inspection, and the removal of assets. The work was carried out to meet industry standards and ensure long-term functionality and safety for the client.

SCOPE OF WORK

1. Planning and Design

  • Developed a detailed plan for the entry system, including:
    • Access points for ease of entry and exit.
    • Safety features to protect personnel.
    • Compliance with industry standards.
  • Designed the system to allow seamless access to internal assets for replacement, repairs, and inspections.

 

2. Safety Measures

  • Established comprehensive temporary safety protocols for working within the wet well, including:
    • Deployment of an internal safety deck to protect existing assets during construction.

 

3. Construction and Installation

  • Built a new 9-inch brick chamber to house the entry system, incorporating all existing services without disruption.
    • Designed, fabricated, and installed a custom access cover featuring a fall arrest safety grill, ensuring compliance with industry specifications.

 

4. Inspection and Handover

  • Conducted thorough inspections to ensure all installations met safety standards and project specifications.
  • Provided a full handover to the client, including demonstrations and final checks.
OUTCOME

The project successfully delivered a secure and functional entry system, providing the client with:

  • Safe and reliable access to the wet well for maintenance and inspections.
  • Enhanced safety features, such as the fall arrest grill, ensuring worker protection during operations.
  • A durable and compliant system designed for long-term use.

 

This project demonstrates our ability to deliver tailored solutions that prioritise safety, functionality, and compliance, ensuring client satisfaction and operational efficiency.